?EUR??,,????'??The pre-existing Lewis Avenue street environment was brutal. Buildings, generally lacking any detail to provide human scale, were jammed up to the right-of-way line and loomed over the street.?EUR??,,????'??
The Lewis Avenue Corridor project transformed the three downtown blocks between Las Vegas and Casino Center boulevards into a pedestrian-friendly oasis. Work on the $1.8 million project started in February 2002 and was completed in September 2002.
To many people, the name Las Vegas evokes ?EUR??,,????'??The Strip?EUR??,,????'??–bright lights, slot machines and stretch limousines. But the city consists of much more than just the infamous gaming industry. Las Vegas is the home to 1.4 million people and in 2000, Mayor Oscar B. Goodman began an effort to create a more pedestrian-oriented ?EUR??,,????'??people place?EUR??,,????'?? in downtown Las Vegas. His initial effort was preparation of the ?EUR??,,????'??Las Vegas Downtown Centennial Plan,?EUR??,,????'?? intended to change the face of downtown into a premier cultural, civic, financial and business center.
Per the Centennial Plan, the Lewis Street Corridor improvements would create the central pedestrian spine for an Office Core District with the Clark County Detention Center at one end and a new federal courthouse building terminating the other end of the three-block corridor.
The pre-existing Lewis Street environment was brutal. Buildings, generally lacking any detail to provide human scale, were jammed up to the right-of-way line and loomed over the street. The automobile travel lanes dominated the remainder of the right-of-way, leaving grossly undersized sidewalks that were completely devoid of shade. SWA began by reallocating the space within the street corridor. Two of the four travel lanes were deemed to be unnecessary and were removed. The resulting ?EUR??,,????'??found?EUR??,,????'?? space was given back to the pedestrian, which resulted in 20-foot wide sidewalk zones.
The linear street space would tie together the public spaces previously created by the landscape architect at the federal courthouse site and the Regional Justice Center. The courthouse, sited 10 feet above street grade, was planned to include a fountain featured at its front door. A design concept emerged from this opportunity. The fountain would become the ?EUR??,,????'??source?EUR??,,????'?? for a ?EUR??,,????'??wash?EUR??,,????'?? that would meander along the street and would become the backbone of the streetscape environment.
SWA prioritized the program elements based upon those most critical in accomplishing the goal of a useable pedestrian space. Shade was of the utmost importance. And now that the sidewalks would be increased in size, a double row of ash trees could line both sides of the street and would create dappled shade as well as a human scale and a buffer against unfriendly architecture. Because the street trees would be of such great importance, SWA designed a continuous planting trough filled with structural soil so the trees could more closely reach their potential height, spread dimensions and have greater longevity.
The central wash, an artistic interpretation of a natural system, is a meandering cobble-lined feature that is recessed two steps below sidewalk grade so that people can sit along its edges. The exposed edge also reveals the color and texture of the natural landscape. The wash changes character as it moves to each successive block and evolves from an organic form to a system of rills. Fountain features along the way serve as water sources and a cascading water wall merges out of the lower basin, oriented along the plaza axis and perpendicular to Fourth Street to announce the space to those headed for The Fremont Experience. Native, arroyo plant materials are integrated into the wash to allude to the natural desert landscape.
The focal point is the public plaza on Lewis Avenue, between Las Vegas Boulevard and Fourth Street. The plaza, which had been a parking lot, now has a water feature spilling into an urban waterway.
Another unique element of the project is the Poet?EUR??,,????'???s Bridge that serves as a walkway over the water. Imbedded within the bridge are verses by poets who were all, at one time, Las Vegas and Nevada residents.
Other project features include wide sidewalks to accommodate foot traffic, outdoor caf????(C)-style seating, double rows of ash trees and shrubs to provide a shade canopy, and hundreds of smaller plants to add to the aesthetics of the emerging downtown business district.
The Lewis Avenue Corridor site plan incorporates two new buildings, the new Regional Justice Center and the new federal courthouse and provides a continuous canopy of shade trees the entire three blocks.
The plaza in the third block celebrates the historic Fifth Street School, providing expanded public space at the new federal courthouse. The water feature emerging from the pool at the federal courthouse carves its way through the center of the plaza, revealing the many layers of the regional landscape.
A distinct design challenge came from the city?EUR??,,????'???s standard storm drainage design approach. Due to the limited rainfall in Las Vegas, the city did not typically implement a storm drainage system, but simply allowed the streets to flood during isolated rainfall events. To alleviate the problems that would result for the pedestrian in such an environment, the landscape architect tipped the entire ground plane to a collection point to rid the street of standing water and further reinforce the goal of pedestrian use.
Per FTA funding requirements, construction was required be completed by August 2002 and Schematic Design had only been completed in the fall of 2001. SWA compressed a significant level of design, documentation and construction work into a 12-month time period without compromising quality and design intent.
Pedestrian pole lights: Gardco
Tree up lights: Bega
Stone suppliers: William Candee Enterprises, Corona, CA; New England blue stone ?EUR??,,????'??Lilac?EUR??,,????'??
Tree grates: Ironsmith Inc.
Fountain materials: Fountain People, Austin, TX
Pre cast concrete: Quick Crete Products, Norco, CA
Bollards and poet?EUR??,,????'???s bridge trash and benches: Victor Stanley
Awards:
2003 ASLA National Merit Award
2003 American Public Works Association Project of the Year.
2003 American Public Works Association (APWA) Project of the Year under $2 million
(The APWA presents two outstanding project awards yearly at the spring and fall conferences. The fall conference recognizes projects costing more than $2 million and the award in the spring is for projects under $2 million.)
2004 The Las Vegas Chapter of the American Concrete Institute Excellence in Concrete award for imaginative and aesthetic use of concrete. More than 1,000 cubic yards of concrete were used. The supplier was Nevada Ready Mix.
?EUR??,,????'??This recognition by the construction community is a tremendous honor and certainly speaks well of the integrity and aesthetic quality of projects completed by the Department of Public Works,?EUR??,,????'?? said Las Vegas City Manager Doug Selby. ?EUR??,,????'??We recognize that internally, but it is especially gratifying when our peers take note as well.?EUR??,,????'??
SWA Group provided landscape architectural design, documentation and construction phase services. Jim Lee, principal in charge, Lawrence Reed, project designer, Patrick Curran, project manager.
Contractor: Las Vegas Paving Project Owner: City of Las Vegas Irrigation Design: Russ Mitchell and Associates Civil Engineering: Poggemeyer Design Group Electrical Engineering: JBA Consulting Engineers
Funding was provided by a federal TEA-21 Streetscape Enhancement Grant, the Nevada Department of Transportation Stewardship Program, the Regional Transportation Commission of Southern Nevada and the city of Las Vegas.
Francisco Uviña, University of New Mexico
Hardscape Oasis in Litchfield Park
Ash Nochian, Ph.D. Landscape Architect
November 12th, 2025
Sign up to receive Landscape Architect and Specifier News Magazine, LA Weekly and More...
Invalid Verification Code
Please enter the Verification Code below
You are now subcribed to LASN. You can also search and download CAD files and spec sheets from LADetails.