Products, Vendors, CAD Files, Spec Sheets and More...
Sign up for LAWeekly newsletter
At Roberts Academy in Cincinnati, Invisible Structures Terratame² was placed between the school maintenance area and the detention pond. Ten rolls of Terratame² model 2020 were unrolled and anchored in less than two days. Access to the detention pond for pickup trucks and other light-duty vehicles, was achieved with installation of 4,300 sq. ft.) of Terratame² Terratame² was unrolled and placed directly on top of the existing soil and under the fence. Allison Landscaping was charged with finding an aesthetically pleasing solution to providing the maintenance crew access to the detention pond. The Allison team looked both at Grasspave² and Terratame² for a beautiful, grass-covered solution. Both products would work for this site, but since the maintenance vehicles will be no larger than pickup trucks, the Allison team decided Terratame² would work. The ten rolls of Terratame² took less than two days to prep, unroll, and anchor. Grass will grow up and hide the Terratame² by spring. For more information visit https://www.invisiblestructures.com/project_profiles/stateprovince/ohio/roberts-academy-cincinnati-oh/
Raleigh, North Carolina
Francisco Uviña, University of New Mexico
Hardscape Oasis in Litchfield Park
Ash Nochian, Ph.D. Landscape Architect
Sign up to receive Landscape Architect and Specifier News Magazine, LA Weekly and More...
Invalid Verification Code
Please enter the Verification Code below
You are now subcribed to LASN. You can also search and download CAD files and spec sheets from LADetails.