PRODUCT DESCRIPTION

EZ Street can be applied when air temperatures are between 0°F and 100°F; however, EZ Street will be most pliable, workable, and compactable at air temperatures ranging from 70°F to 90°F. In the winter months, warming of the EZ Street material prior to an application via a "hot box", heated dump bed, or patching truck is acceptable, although, it is imperative that the material temperature does not exceed 125°F. To ensure optimum performance EZ Street should be applied and compacted in two-inch (2") maximum lifts. A vibratory steel wheel roller will always provide optimum results and performance; however, steel wheel or pneumatic rollers, compactor plates, wheel rolling, and hand tamping are also acceptable methods of compaction. Over-compaction is rarely an issue.