A Model of Wetland Reclamation and Environmental Education
he Black Rock Sanctuary project actually started in the late 18
ABOVE: Agents from the US FWS visited the site and noted conce
The slack water system was a way to travel from one pool, retai
Black Rock
Sanctuary
The
By Carl R. Kelemen, RLA, FASLA, Principal, Evergreen Landscape
T
T
The slack water system was a way to travel from one pool, retai
BEFORE (LEFT) and AFTER (BELOW):  More than 27 acres of new w
mound-pool-before.jpg
Mound-pool-after.jpg
The slack water system was a way to travel from one pool, retai
The interactive displays along the trail system were designed t
In the process of constructing the wetlands, over 12,000 cubic
coalsiltspoil2.jpg
brs_interp_amphibian.jpg
brs_interp_bird.jpg
One of the major challenges inherent with this project was t
Due to the expense of the project, some ideas for the sanctuary
BRSnest1.jpg
BRIT-Bird-nest.jpg
The slack water system was a way to travel from one pool, retai
Combined with the wetland creation project was the restoration